Energy

Screened 2,400 square miles in 6 weeks

Borealis Wind Partners

A wind developer replaced a year of piecemeal desktop studies with a single multi-criteria siting analysis spanning three states.

Wind turbines on open ridgeline terrain viewed from the air

The challenge

Borealis Wind Partners evaluated candidate sites one at a time, with consultants assembling wind, terrain, land ownership, transmission, and environmental constraints from scratch for each study. Screening a single county took months, and two late-stage sites had already been abandoned over constraints that should have surfaced on day one.

The approach

GeoGarmeux consultants assembled the constraint layers once — wind resource, slope, parcel ownership, transmission proximity, protected areas, and setback rules — into a weighted multi-criteria model in GeoGarmeux Atlas. The development team now adjusts weights and watches the ranked site map update live, and every screened parcel carries its full constraint history.

The results

  • 2,400 square miles screened in 6 weeks across three states
  • 14 constraint layers combined in one repeatable siting model
  • 2 lease negotiations opened on sites the old process had never flagged

“We compressed a year of desktop studies into a model we can re-run over lunch. The map does the arguing for us.”

VP of Development, Borealis Wind Partners
More customer stories

Keep reading

All customer stories

Get a result like this one

Bring us the number you need to move. We'll bring the platform, the sensors, and the people.

Contact Sales