Construction site with tower cranes and earthworks seen from a drone
Construction & AEC

Turn site conditions into schedule certainty

Most schedule slips start with a surprise in the ground or a design built on stale site data. Survey-grade capture before, during, and after construction keeps the model, the site, and the schedule telling the same story.

Challenges we solve

What construction and AEC teams bring to us

These are the problems that show up in our first conversation — and where the map starts paying for itself.

Designs built on last year's site

Grading plans drawn from old topo meet different ground on day one, and the change orders start. Fresh drone photogrammetry and LiDAR give designers the site as it is, not as it was.

Progress tracked by walking the site

Weekly walkthroughs produce estimates that vary by who did the walking. Scheduled drone flights measure cut, fill, and installed work the same way every time, with quantities you can invoice against.

As-builts that never leave the trailer

What actually got buried where is recorded on markups that rarely make it back to the owner's systems. Capturing as-builts digitally, in the owner's formats, closes the loop before demobilization.

Capabilities

How we get there

The mix of platform, sensors, and people we reach for most in construction and AEC work.

Illustrative Surveying & Mapping work for the construction and AEC sector

Surveying & Mapping

Licensed crews, LiDAR, and drone photogrammetry deliver survey-grade existing conditions and progress measurement.

Illustrative GIS Software & Analytics work for the construction and AEC sector

GIS Software & Analytics

Every flight, survey, and as-built lands in one shared site record the whole project team can open in a browser.

Illustrative Consulting & Integration work for the construction and AEC sector

Consulting & Integration

Connect site data to BIM, scheduling, and project controls so quantities flow instead of being retyped.

Earthmoving equipment shaping terraced ground on a large construction site
Heavy civil contractor

Weekly flights replaced monthly quantity disputes

A heavy civil contractor put weekly drone-derived earthwork quantities in front of the owner and the estimator alike — and closed out pay applications without a single measurement dispute.

45% Fewer site-condition change orders after pre-design capture

Put your construction and AEC operation on the map

Tell us what you need to see, measure, or connect in your territory — we'll bring the right mix of platform, sensors, and people.

Contact Sales